ELECTRICITY: SUBSIDIARY LEGISLATION
ELECTRICITY BY-LAWS
ARRANGEMENT OF BY-LAWS
BY-LAW
PART I
PRELIMINARY PROVISIONS
1. Citation
2. Interpretation
PART II
LICENSING
3. Licence application fees
4. Objects of licensing system
5. Applications
6. Advertising
7. Objections
PART III
INSTALLATION PERMITS
Division 1
The Committee
8. Establishment of Committee
9. Rules and procedures
10. Permit required
11. Meetings of the Committee
12. Technical qualifications
13. Types ofpermit
Division 2
Application for Permit
14. Application for permit
15. Companies and organizations
16. Conditions to be satisfied
17. Voting
18. Grant of permit
19. Cancellation of permit
20. Obtaining information
PART IV
SUPPLY AND QUALITY OF SERVICE
Division 1
Supply
21. Declared method of supply to consumers
22. Licensee to provide constant supply
23. Licensee may lessen or discontinue supply
24. Licensee shall not permanently connect
25. Disconnexion of works in certain circumstances
26. Protection of telegraph lines
27. Inspection and testing
28. Availability of By-laws
Division 2
Conditions on the Construction of Substation and Private Generation
29. Design and protection of works
30. Switchgear
31. Fuse
32. Automatic circuit-breakers
33. Joints and connexions
34. Isolating and protective devices
35. Switchboard
36. Building for electrical purposes
37. Outdoor substations
38. Earthing of metal-work
39. Earthing of consumer’s installation
40. Earth electrodes
41. Leakage to earth
42. Arc-suppression coils
43. Service lines on consumer’s premises
44. Construction and installation of cables
45. Metallic protection for high-voltage cables
46. Identification of neutral conductor, cable labeling and insulation test
Division 3
Standards of Measurement
47. Fundamental electrical units
48. Derived electrical units
49. Measurement of electricity
Division 4
Quality of Service and Supply Standards
50. Quality of service and supply standards
PART V
SAFETY CODE RULES
Division 1
Application of Part
51. Application of this Part
Division 2
General Provisions
52. Information and instruction
53. Variation
54. Special procedures
55. Objections
56. Accident and dangerous occurrences
57. Duties
58. Safety equipment and protective clothing
59. Electric shock
Division 3
General Safety Precautions
60. Access to work in operational premises
61. Vessel containing flammable substance
62. Work in fire protected areas
63. Work on poles, towers and high structures
64. Access to high-voltage apparatus and conductors
65. High-voltage switching
66. Records
67. Failure of supply
68. Voltage testing devices
Division 4
Safety Precautions for Work on or near High-Voltage Systems
69. General requirements
70. Isolation of apparatus and conductors
71. Earthing
72. Approach to exposed live high-voltage conductors or insulators supporting them
73. Work in substations and switching stations containing exposed live high-voltage conductors
74. Permit-to-work
75. Sanction-for-test
76. Procedure for temporary withdrawal or suspension
77. Limitation
Division 5
Safety Precautions and Procedures Applicable to Low-Voltage Systems
78. General
79. Requirements for work on dead low-voltage apparatus
80. Precautions for work on live low-voltage cables
81. Precautions for work on dead low-voltage overhead lines
82. Work on live low-voltage apparatus and conductors
83. Precautions for work on live low-voltage cables
84. Precautions for work on live low-voltage overhead lines
85. Application of high-voltage rules to work on low-voltage apparatus and conductors
86. Testing and adjustment of low-voltage apparatus
PART VI
WIRING
Division 1
General
87. Administration of by-laws
88. Application of by-laws
89. Inspection of installations
90. Procedure for settling disputes
91. Prior notification to undertaker
92. Accommodation to be provided
93. Meter panels and connexions
94. Custody of licensee’s property
95. Disconnexion in certain circumstances
96. Connexion of neutral with earth
97. Protection of telecommunication
98. Guidance and instructions
99. Certificate of inspection and testing
Division 2
Construction of Consumer’s Installations
100. Design and mechanical protection
101. Electrical protection
102. Isolation and control position
103. Earthing of metal-work
104. Protection against earth leakage
105. Arc-suppression coils
106. Earthing of installation
107. Electrode boilers
108. Auto-transformers
109. Capacitors
110. Indoor substations
111. Outdoor substations
Division 3
Underground Cables
112. Construction and installation
113. Joints and connexions
114. Metallic protection of high-voltage cables
115. Identification and insulation test
Division 4
Overhead Lines
116. Overhead lines
117. Constructional materials requirements
118. Minimum heights and insulation
119. Unmetered service lines
120. Overhead lines crossing railway tracks
121. Different voltages in…
Members-only content